Equipment classes.
We transact across the installed base of industrial and aeroderivative gas turbines, reciprocating engine packages, and associated balance of plant.
We do not publish inventory. Available packages, condition, and pricing are shared directly with qualified counterparties.
Contact us→Aeroderivative
Fast-start, high simple-cycle efficiency, and the most genuinely redeployable machines in the installed base. What a campus buys when the interconnection date will not hold.
Aeroderivative
Fast-start, high simple-cycle efficiency, and the most genuinely redeployable machines in the installed base. What a campus buys when the interconnection date will not hold.
- Aeroderivative
GE LM6000 (PC / PF / PF+ / SPRINT)
50 or 60 HzHigh simple-cycle efficiency, ten-minute start to full load, and load-following capability. The default choice where the interconnection has slipped and the campus needs firm capacity ahead of backfeed. Variant matters — a PC and a PF are different machines to a permitting team.
- Aeroderivative
GE LM2500 (base / + / +G4)
50 or 60 HzFast-start, high availability, modular, and among the most genuinely redeployable machines in the installed base. Deep industrial and marine fleet, and the aftermarket to support it.
- Aeroderivative
Siemens SGT-A35 / SGT-A65
50 or 60 HzIndustrial RB211 and Trent 60 packages. Core aeroderivative inventory alongside the LM fleet, with a live parts and repair market.
Mobile and trailer-mounted
Capacity that arrives on wheels and can leave the same way when utility service finally lands.
Mobile and trailer-mounted
Capacity that arrives on wheels and can leave the same way when utility service finally lands.
- Trailer-mounted
Mobile aeroderivative packages
50 or 60 HzGE TM2500 and comparable trailer-mounted units. Minimal civil works, weeks rather than quarters to first fire, and relocatable when the utility service date finally arrives. The workhorse of real bridge power.
Industrial, 5–22 MW
Packaged industrial machines at the granularity a phased campus buildout actually orders in — large installed base, well-supported aftermarket.
Industrial, 5–22 MW
Packaged industrial machines at the granularity a phased campus buildout actually orders in — large installed base, well-supported aftermarket.
- Industrial gas turbine
Solar Taurus / Titan / Mars
50 or 60 HzThe dominant fleet in the 5–22 MW behind-the-meter industrial band, and the right granularity for a phased campus buildout. Large secondary market, well-supported aftermarket.
Reciprocating engines
Engine-based capacity, where granularity and block-load response matter more than peak simple-cycle heat rate.
Reciprocating engines
Engine-based capacity, where granularity and block-load response matter more than peak simple-cycle heat rate.
- Reciprocating
Reciprocating engine packages
50 or 60 HzWärtsilä 34SG-class gas engines, Caterpillar 3516 / C175 and mtu Series 4000 diesel gensets, and comparable platforms. Modular, excellent part-load heat rate, strong block-load acceptance, and N+1 granularity without stranding capacity.
Industrial frame
Utility and industrial-scale machines out of retiring and canceled plants. We are candid about which of these are economic to relocate and which are not.
Industrial frame
Utility and industrial-scale machines out of retiring and canceled plants. We are candid about which of these are economic to relocate and which are not.
- Industrial frame
GE Frame 5 (5P / 5D)
50 or 60 HzAmong the most-traded used gas turbines in the world. Simple, forgiving, widely understood, and economic to relocate into industrial captive service.
- Industrial frame
GE Frame 6B
50 or 60 HzLoad-geared, and offered in both 50 and 60 Hz — the load gear and generator set the frequency, so changing it means new ones. One of the most tradeable frame machines in the market, with a live aftermarket and a long record in cogeneration and industrial captive power.
- Industrial frame
GE Frame 7EA
60 HzThe E-class machine that actually moves. Deep parts and third-party repair support, well-understood rotor life limits, and a long redeployment record.
- Industrial frame
GE 7F (.03 / .04 / .05)
60 HzRelocates far less freely than the E-class: units are often married to a matched HRSG and steam turbine, the DLN 2.6 combustion system is tightly held, and the generational splits are not parts-interchangeable. We transact in them, but we are candid about which ones are economic to move.
- Industrial frame
Siemens / Westinghouse 501 (D5 / D5A / F)
60 HzThe D5 and D5A have a long and genuine second-life record. The F-class is a different commercial proposition and relocates far less often. Treat them as separate machines, because they are.
- Industrial frame
Siemens V94 series
50 HzLarge machines with an installed base concentrated in Europe, the Middle East, and Asia. The V84 is the 60 Hz sibling — a different machine, not a conversion.
- Industrial frame
Alstom / Ansaldo GT26
50 HzLarge frame with sequential reheat combustion. New-unit technology and OEM parts IP passed to Ansaldo Energia in the GE/Alstom divestiture; GE retained service on most of the legacy installed base. The GT24 is the 60 Hz version.
Electrical and balance of plant
Frequently the real constraint on a schedule — the transformer, the switchgear, or the control system rather than the turbine.
Electrical and balance of plant
Frequently the real constraint on a schedule — the transformer, the switchgear, or the control system rather than the turbine.
- Long-lead electrical
Generator step-up transformers and MV switchgear
50 or 60 HzFrequently the hardest long-lead item on a campus — harder than the turbine. A tested GSU of the right rating and impedance, with matching switchgear and protection, can be the difference between energizing on schedule and waiting on a transformer queue.
- Balance of plant
Steam turbines and balance of plant
Steam turbines out of retiring combined-cycle stations, plus generators, exciters and load gears, fuel gas compression, SCR and CO catalyst, transformers, switchgear, and control systems — including migration off obsolete platforms (Mark V, Teleperm, WDPF). Controls are frequently the real constraint on a redeployment schedule.
Output is quoted new and clean at ISO conditions, again at your site conditions, and — where a recent performance test exists — as tested, with the correction basis and losses stated. Condition, hours, and availability are specific to each package and are discussed directly rather than published.
We do not offer 50 Hz frame machines into 60 Hz service. A 9E is not a 7EA and a V94 is not a V84 — those are different machines, not conversions. Aeroderivative and load-geared frame packages are a different question, and we will tell you which is which.
Manufacturer names and model designations are used for identification purposes only. Power View is not affiliated with, authorized by, or endorsed by any original equipment manufacturer.